EFSVALVES / APPLICATION ENGINEERING
Flare Header, Gas Recovery & Emergency Bypass
One possible conceptual arrangement showing recoverable flow routed to an FGR system, an independent primary flare route, and an optional project-specific EF-SHP high-capacity bypass.
Swipe horizontally to inspect the complete schematic.
Normal operation: Recoverable process gas is routed to the FGR system. Where required, purge or sweep gas can continue toward the flare while the optional EF-SHP bypass remains closed.
Recovery routePurge / sweepEmergency route